Seaward 300 PrimeTest User Manual

Browse online or download User Manual for Equipment Seaward 300 PrimeTest. Seaward 300 PrimeTest User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 2 - Operating Instructions

PrimeTest 300 Operating Instructions -9- 10.2.2 Set Contrast…………………. 39 10.2.3 Auto Off Time……………….. 40 10.2.4 Data Entry……………………. 40 10.2.5 Backligh

Page 3

PrimeTest 300 Operating Instructions -10- DECLARATION OF CONFORMITY As the manufacturer of the apparatus listed, declare under our sole responsibilit

Page 4

PrimeTest 300 Operating Instructions -11- IntroductionThe PrimeTest 300 is a hand held, battery powered, multifunction test instrument capable of per

Page 5

PrimeTest 300 Operating Instructions -12- 1.0 User NotesThese operating instructions are intended for the use of adequately trained personnel. The fo

Page 6 - Figure 5 IEC Lead Test

PrimeTest 300 Operating Instructions -13- 2.0 Safety NotesThis PrimeTest 300 has been built and tested in accordance with: IEC 61010-1: 2001. IEC 615

Page 7

PrimeTest 300 Operating Instructions -14- - Do not operate the PrimeTest 300 in an explosive gas or dust environment. - Do not touch the bare tip of

Page 8

PrimeTest 300 Operating Instructions -15- 3.0 Accessories3.1 Standard AccessoriesThe PrimeTest 300 is supplied with the following items: 3.1.1 1 off

Page 9 - Table of Contents

PrimeTest 300 Operating Instructions -16- 4.0 Unit Description Refer to fig. 1 and fig. 2. The PrimeTest 300 is a hand held, multi function, instrume

Page 10

PrimeTest 300 Operating Instructions -17- 5.0 Getting Started5.1 Charging New Batteries Before using the PrimeTest 300 for the first time the recharg

Page 11

PrimeTest 300 Operating Instructions -18- 5.4 Battery Health Check While the PrimeTest 300 is powered on there are periodic checks of the batteries.

Page 12

Operating InstructionsBracken Hill South West Industrial Estate Peterlee Co Durham SR8 2SW ENGLAND Tel: +44(0)191 5863511 www.seaward.co.uksales@seawa

Page 13

PrimeTest 300 Operating Instructions -19- The Data Transfer functions are accessed by pressing Menu (F4), selecting Data Transfer using the arrow

Page 14

PrimeTest 300 Operating Instructions -20- The PrimeTest 300 is now ready to transfer data. No. of assets shows the number of records that will be dow

Page 15

PrimeTest 300 Operating Instructions -21- 6.3 Send/Receive Config Data This feature can be used to transfer Site, Location, User and Comments lists

Page 16

PrimeTest 300 Operating Instructions -22- Data is transferred to the PrimeTest 300 using the format shown below: [SiteName] London Leeds Newcastle [L

Page 17

PrimeTest 300 Operating Instructions -23- 6.3.2 Receive Config Data FollowthestepsaboveinSendConfigDatatorunthe Bluetooth Downloader and connect the

Page 18

PrimeTest 300 Operating Instructions -24- 7.1 Search The Search (F1) function is used to search through saved data. The search filter is shown belo

Page 19

PrimeTest 300 Operating Instructions -25- This allows selected records to be printed onto labels, downloaded to PC or deleted from memory. Individual

Page 20

PrimeTest 300 Operating Instructions -26- 8.0 Memory Options Memory options is used to view information about the PrimeTest 300 memory status. Press

Page 21

PrimeTest 300 Operating Instructions -27- 9.0 Configuration The configuration facility is used to edit test sequences, set date and time, and configu

Page 22

PrimeTest 300 Operating Instructions -28- The PrimeTest 300 allows the user to Edit, Copy, Delete or Print an existing sequence or create a New seque

Page 23

PrimeTest 300 Operating Instructions-2-

Page 24

PrimeTest 300 Operating Instructions -29- 9.1.4 Creating a New Sequence A new test sequence can be created using this option. The default name for a

Page 25

PrimeTest 300 Operating Instructions -30- Now scroll through the list of default tests until the required test is highlighted and press Select (F4).N

Page 26

PrimeTest 300 Operating Instructions -31- 9.1.5 User Tests The PrimeTest 300 has the unique ability to create user-defined tests. When using the test

Page 27

PrimeTest 300 Operating Instructions -32- The User Test Name will now be highlighted. For convenience a selection of commonly used names have been en

Page 28

PrimeTest 300 Operating Instructions -33- An example test sequence created to measure microwave leakage is shown below. When this test sequence is ru

Page 29

PrimeTest 300 Operating Instructions -34- 9.2 Set Date/TimeThe Primetest 300 is equipped with a real-time clock. To alter the date or time press Men

Page 30

PrimeTest 300 Operating Instructions -35- 10.0 User Options Each User has the option to customise aspects of the PrimeTest 300 in accordance with the

Page 31

PrimeTest 300 Operating Instructions -36- 10.1.1 Asset IDThis can be set to automatically increment the ID number at the end of each test, present a

Page 32

PrimeTest 300 Operating Instructions -37- New Test will auto save at the end of a test sequence and then open the Asset Details window ready for a n

Page 33

PrimeTest 300 Operating Instructions -38- Pressing New Test (F2) will proceed to the Asset Details window, ready for a new test. Pressing Options(F3

Page 34

PrimeTest 300 Operating Instructions-3- Figure 1 PrimeTest 300 Front View Figure 2 PrimeTest 300 End View

Page 35

PrimeTest 300 Operating Instructions -39- 10.2 Preferences There are a number of general features within the PrimeTest 300 that can be setup/customiz

Page 36

PrimeTest 300 Operating Instructions -40- 10.2.3 Auto Off Time (mins) The PrimeTest 300 will power itself off after a period of inactivity. This time

Page 37

PrimeTest 300 Operating Instructions -41- highlight desired function and the left/right arrow keys to set. 10.3 Change User The PrimeTest 300 has a p

Page 38

PrimeTest 300 Operating Instructions -42- Use the left/right arrow keys to change to an existing User Name or press New (F3) and type in a new name a

Page 39

PrimeTest 300 Operating Instructions -43- Note: Access for other Users is only restricted after a password has been set for the Admin User. If Admin

Page 40

PrimeTest 300 Operating Instructions -44- Enter the current password into the first field – if no password is set then leave this field blank. Use th

Page 41

PrimeTest 300 Operating Instructions -45- 11.0 Manual Test FunctionsOnce in Manual mode the tester can perform one of seven tests as described below.

Page 42

PrimeTest 300 Operating Instructions -46- part. Press the green START key to begin the test. The test will run for the duration set. To end the test

Page 43

PrimeTest 300 Operating Instructions -47- 11.3 IEC Lead Refer to Fig. 5 IEC leads are tested in 3 stages, continuity, insulation and polarity. The te

Page 44

PrimeTest 300 Operating Instructions -48- 11.4 Class II Leakage Current Refer to Fig 6 This test is applicable on Class II Equipment. The Class II Le

Page 45

PrimeTest 300 Operating Instructions -4- Figure 3 Earth Continuity Measurement Figure 4 Insulation Measurement (Class II)

Page 46

PrimeTest 300 Operating Instructions -49- Neutral short exists or the EUT mains current consumption is too high. Internal Relay checks–Beforeapplying

Page 47

PrimeTest 300 Operating Instructions -50- Press Setup (F3) to set the Test Duration and Pass/Fail limit. Use the arrow keys to highlight and set. Pre

Page 48

PrimeTest 300 Operating Instructions -51- While the PrimeTest 300 performs the test the LCD will show 0.0Ω flashing. When the test is complete the me

Page 49

PrimeTest 300 Operating Instructions -52- 12.0 Bluetooth FunctionsThe PrimeTest 300 has built in Bluetooth connectivity. It is possible to connect a

Page 50

PrimeTest 300 Operating Instructions -53- The Bluetooth Favourites list comprises of four sub-lists (device types), each of which can store up to 3 a

Page 51

PrimeTest 300 Operating Instructions -54- Wait for the progress bar to complete. Use the arrow keys to highlight the field labelled “New” and press t

Page 52

PrimeTest 300 Operating Instructions -55- Note: Some Bluetooth devices do not report a recognisable name and may cause confusion when setting up Fav

Page 53

PrimeTest 300 Operating Instructions -56- A PIN number can be entered if required by the device to be added to the Favourites list. Note: Seaward ac

Page 54

PrimeTest 300 Operating Instructions -57- “My Laptop” is now a Bluetooth Favourite and the PrimeTest 300 will automatically establish a connection wi

Page 55

PrimeTest 300 Operating Instructions -58- 13.0 Automatic Test ModeThe automatic mode allows the PrimeTest 300 to perform a predefined test sequence a

Page 56

PrimeTest 300 Operating Instructions -5- Figure 5 IEC Lead Test Figure 6 Class II Leakage Measurement

Page 57

PrimeTest 300 Operating Instructions -59- for the barcode scanner in Bluetooth Favourites.Whilst searching, the Bluetooth status icon shows an egg ti

Page 58

PrimeTest 300 Operating Instructions -60- keypad. Simply enter the required ID in the Asset ID field as shown below. The function keys can be used to

Page 59

PrimeTest 300 Operating Instructions -61- PrimeTest 300 will automatically list any appropriate data currently in memory that begins with the charact

Page 60

PrimeTest 300 Operating Instructions -62- The UP/DOWN can now be used to scroll through the Site list until the required Site is highlighted. Press S

Page 61

PrimeTest 300 Operating Instructions -63- 13.2.2 Adding a new Site If the required Site is not already in memory, simply use the keypad to enter the

Page 62

PrimeTest 300 Operating Instructions -64- 13.3 Entering Location Information Move the cursor to the Location field.A Location can be selected in the

Page 63

PrimeTest 300 Operating Instructions -65- Select the desired Location from the list using the UP/DOWN arrows and press Select (F4) to confirm.Note:

Page 64

PrimeTest 300 Operating Instructions -66- The Edit keys can be used to correct the entry. When the required data has been entered, press the Enter (F

Page 65

PrimeTest 300 Operating Instructions -67- Pressing the Left or Right arrows will open the list of available test sequences. Press the index letter ne

Page 66

PrimeTest 300 Operating Instructions -68- To enter a value, simply move the cursor to the correct field using the UP/DOWN arrows Now enter the requir

Page 67

PrimeTest 300 Operating Instructions -6- Figure 7 Class I Leakage Current Measurement Figure 8 RCD and Earth Loop Test

Page 68

PrimeTest 300 Operating Instructions -69- If the red STOP key is pressed during a test then the test is aborted and the abort menu appears as shown b

Page 69

PrimeTest 300 Operating Instructions -70- This sequence will now progress to the Earth Continuity test as shown. This test will measure the resistanc

Page 70

PrimeTest 300 Operating Instructions -71- The test will run until the countdown timer in the Duration field has reached zero. Note: During the test,

Page 71

PrimeTest 300 Operating Instructions -72- Similarly, if the last reading is greater than the Limit, a Fail result is recorded. This is indicated by a

Page 72

PrimeTest 300 Operating Instructions -73- The next test in this sequence is an insulation resistance test. The display is as shown below. Note: In o

Page 73

PrimeTest 300 Operating Instructions -74- The Class I icon is illuminated to indicate that the insulation resistance is measured between the live/neu

Page 74

PrimeTest 300 Operating Instructions -75- The next test in this sequence is a Protective Conductor Current measurement. The display now shows the sup

Page 75

PrimeTest 300 Operating Instructions -76- The Test Type field indicates whether the sequence was a visual inspection only or a full test where measu

Page 76

PrimeTest 300 Operating Instructions -77- 13.7.1 View Results This will display the results for each test in the sequence as shown below. The Up and

Page 77

PrimeTest 300 Operating Instructions -78- 13.7.3 Print Label This allows Pass/Fail labels to be printed using the printer in the Bluetooth Favourites

Page 78

PrimeTest 300 Operating Instructions -7- Limited Warranty & Limitation of LiabilitySEAWARD Electronic Limited guarantees this product to be free

Page 79

PrimeTest 300 Operating Instructions -79- Using Change Format (F1) to select a label format that displays a printed header will now display the text

Page 80

PrimeTest 300 Operating Instructions -80- 14.0 Electrical Specifications 14.1 Earth Continuity Test Current (2Ω load) ±200 mA Test Circuit Voltage

Page 81

PrimeTest 300 Operating Instructions -81- 14.4 Class II Leakage Current Test Voltage Mains supply 230V +10% / -15% Max Load Current 10A Input Impeda

Page 82

PrimeTest 300 Operating Instructions -82- 14.7 RCD Trip Time Test Voltage Mains supply 230V +10% / -15% Test Current 30mA rms sinusoidal Test Duratio

Page 83

PrimeTest 300 Operating Instructions -83- 15.0 Environmental Conditions 15.1 The PrimeTest 300 has been designed to perform tests and measurements in

Page 84

PrimeTest 300 Operating Instructions -84- 16.0 Maintenance Warning: Always ensure that the PrimeTest 300 is disconnected from all voltage sources bef

Page 85

PrimeTest 300 Operating Instructions -85- 16.3 CleaningClean the external case of the PrimeTest 300 with a clean dry cloth. Avoid using solvents and

Page 86

PrimeTest 300 Operating Instructions -86- 16.5 Battery ReplacementOver a period of time, (typically 1 to 2 years), the batteries will loose their abi

Page 87

PrimeTest 300 Operating Instructions -87- and replaced where necessary. There are 3 fuses, one in the mains plug and 2 internal fuses. The mains plug

Page 88

PrimeTest 300 Operating Instructions -88- fuse holder. Relocate the battery cover over the battery compartment and fasten in position with the batter

Page 89

PrimeTest 300 Operating Instructions -8- Table of Contents 1.0 User Notes…………………………….. 12 2.0 Safety Notes……………………………13 3.0 Accessories……………………………15

Page 90

PrimeTest 300 Operating Instructions -89- 16.8 Spare Parts.Seaward Part No Fuse 1¼ “ x ¼ “ 12.5A 250V Type T 27B111 Test Lead (with alligator clips)

Page 91

PrimeTest 300 Operating Instructions -90- 17.0 Useful Information Parameter Default Min Max Earth Continuity P/F limit 1.00 0.01 5.0 Earth Continuit

Comments to this Manuals

No comments