PrimeTest 50 Operating Instructions 1 Operating Instructions Bracken Hill South West Industrial Estate
PrimeTest 50 Operating Instructions 10• If the measured value is within acceptable limits a tick is placed next the Earth Cont enunciator. • T
PrimeTest 50 Operating Instructions 11 3.3 Testing a Class II Appliance • Visually inspect the appliance and mains cord for signs of damage. •
PrimeTest 50 Operating Instructions 12• Check that the appliance power switch is in the ON position. The test will automatically proceed if the ap
PrimeTest 50 Operating Instructions 13• If the Insulation Resistance is lower than the acceptable limit a cross is placed next to the Insulation e
PrimeTest 50 Operating Instructions 144 Specification Earth Continuity Pass Limit 0.2Ω Accuracy* ± 0.03Ω Test current 200mA minimum Test voltag
PrimeTest 50 Operating Instructions 156 Battery Check The PrimeTest 50 is powered from a 6 AA cells which are checked before a test is performed.
PrimeTest 50 Operating Instructions 167 Service and Calibration To maintain the specified accuracy of the measurement results, the instrument mus
PrimeTest 50 Operating Instructions 2Limited Warranty & Limitation of Liability SEAWARD Electronic Limited guarantees this product to be free
PrimeTest 50 Operating Instructions 3DECLARATION OF CONFORMITY As the manufacturer of the apparatus listed, declare under our sole responsibility
PrimeTest 50 Operating Instructions 4Contents 1 Important Information 5 2 Introduction 7 3 Performing Tests 8 3.1 Checking a mains power outlet
PrimeTest 50 Operating Instructions 51 Important Information These operating instructions are intended for the use of adequately trained personnel
PrimeTest 50 Operating Instructions 6 Figure 1. PrimeTest 50 Front View Figure 2. PrimeTest 50 End View
PrimeTest 50 Operating Instructions 72 Introduction The PrimeTest 50 is a hand held battery powered unit suitable for carrying out electrical safet
PrimeTest 50 Operating Instructions 83 Performing Tests Press keys + to switch on the PrimeTest 50. When the unit is ready the display will be a
PrimeTest 50 Operating Instructions 9In the event of a failure, disconnect the PrimeTest 50 from the supply and rectify the fault. Do not leave
Comments to this Manuals